USR250 over RAMP F OVER STONE CR

1.79 MI. W. OF JCT. SR416 · County 157, Ohio · Built 2016 · 1 Lanes · 2,950 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
7904789
Year Built
2016
Length
23.5 m (77.1 ft)
Max Span
23.5 m
Width
10.7 m (35.1 ft)
Lanes
1
Daily Traffic
2,950
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$123,526,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.