EB TPK EXIT 215 RP over I-80 OHIO TURNPIKE

EB OFF RAMP MI POST 215.0 · County 155, Ohio · Built 1993 · 1 Lanes · 1,195 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
7829477
Year Built
1993
Length
94.8 m (311 ft)
Max Span
25.9 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
1,195
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.