I.R. 80 over OVER TRU-US 422-21.24

JCT IR 80 AND US 422 · County 155, Ohio · Built 1970 · 3 Lanes · 21,075 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
7803486
Year Built
1970
Reconstructed
2017
Length
54 m (177.2 ft)
Max Span
26.2 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
21,075
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.