THORNTON ST. over OHIO CANAL (153)

BOWERY TO BOULEVARD STS. · County 153, Ohio · Built 1972 · 2 Lanes · 5,394 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
7760310
Year Built
1972
Length
44.8 m (147 ft)
Max Span
18 m
Width
19 m (62.3 ft)
Lanes
2
Daily Traffic
5,394
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.