IRA RD over CUYAHOGA RIVER

200 FT E OF RIVERVIEW · County 153, Ohio · Built 1996 · 2 Lanes · 1,558 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
7745249
Year Built
1996
Length
48.2 m (158.1 ft)
Max Span
24.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,558
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.