EVERETT ROAD over NORTH FORK

3350 FT EAST OF HAMETOWN · County 153, Ohio · Built 2003 · 2 Lanes · 1,884 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
7731965
Year Built
2003
Length
10.4 m (34.1 ft)
Max Span
9.8 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,884
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.