IR480 over OVER N BEDFORD RD CR-679

3.98 MI N OF SR 82 · County 153, Ohio · Built 2019 · 2 Lanes · 23,010 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
7710151
Year Built
2019
Length
44.8 m (147 ft)
Max Span
17.1 m
Width
16.9 m (55.4 ft)
Lanes
2
Daily Traffic
23,010
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$119,988,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.