IR 76 over Over Barber Rd CR-53

1.63 Mi W of SR 619 · County 153, Ohio · Built 2017 · 8 Lanes · 74,650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
7705132
Year Built
2017
Length
32.5 m (106.6 ft)
Max Span
31.4 m
Width
47.2 m (154.9 ft)
Lanes
8
Daily Traffic
74,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$804,110,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.