SR 21 over SUM-SR 585-0.91

JCT OF SR 21 AND SR 585 · County 153, Ohio · Built 1957 · 2 Lanes · 12,790 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
7701144
Year Built
1957
Reconstructed
2003
Length
75.9 m (249 ft)
Max Span
19.5 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
12,790
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.