SR 8 over SEASONS RD CR-145

2.08 MI S OF SR 303 · County 153, Ohio · Built 1987 · 6 Lanes · 46,747 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
7700148
Year Built
1987
Length
210 m (689 ft)
Max Span
27.4 m
Width
33.5 m (109.9 ft)
Lanes
6
Daily Traffic
46,747
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.