LK0521 MOGADORE over TUSCARAWAS CREEK

0.1 MI. S. OF TR8 · County 151, Ohio · Built 2018 · 2 Lanes · 2,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
7636318
Year Built
2018
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
2,700
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$250,000,000
Total Project Cost
$330,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.