SR 225 over BERLIN RESERVOIR

3.85 MI E OF SR 183 · County 151, Ohio · Built 1990 · 2 Lanes · 6,877 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
7605986
Year Built
1990
Length
103.9 m (340.9 ft)
Max Span
51.2 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
6,877
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.