BEESON ST. CR 41 over US62T

2.25 MI E OF SR 173 · County 151, Ohio · Built 1974 · 4 Lanes · 4,825 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
7602472
Year Built
1974
Length
77.4 m (253.9 ft)
Max Span
20.7 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
4,825
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.