CLINTON FURNACE RD over CLINTON FURNACE (PINE CK

4.30 MI. N OF CR 9 · County 145, Ohio · Built 1993 · 2 Lanes · 125 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
7338422
Year Built
1993
Length
17.1 m (56.1 ft)
Max Span
15.2 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
125
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000
Total Project Cost
$116,690,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.