COOK ROAD over COOK ROAD (TRIB CANDY RN
0.30 MI. E OF SR 23 · County 145, Ohio · Built 1993 · 2 Lanes · 816 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.862981, -82.984081
This bridge is in worse condition than 50% of bridges in County 145. The average bridge in Ohio is 0 years old; this one is 33 years old.
Nearby Bridges
US 23 over CANDY RUN
Built 1945
LINTZ HOLLOW ROAD over LINTZ HOLLOW RD (CANDY R
Built 1996
HOUSTON HLW-LR RD over HOUSTON HLW-LR (STREAM)
Built 1975
HOUSTON HLW-LR RD over HOUSTON HLW-LR (STREAM)
Built 1975
RAMP B (823-SB) over OVER NORFOLK SOUTHERN RR
Built 2018
RAMP B (SB 823) over OVER FAIRGROUND RD
Built 2018
SR 823 over OVER FAIRGROUND ROAD
Built 2018
RAMP C (NB 823) over OVER FAIRGROUND RD
Built 2018
SR 823 over OVER US 23 AND NS RR
Built 2018
RAMP C (823 NB) over NORFOLK SOUTHERN RR
Built 2018
Bridge Details
- Structure #
- 7338090
- Year Built
- 1993
- Length
- 9.1 m (29.9 ft)
- Max Span
- 7.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 816
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $54,000
- Total Project Cost
- $56,455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.