COOPER ROAD over COOPER ROAD (MCCULLOUGH)
0.80 MI. N OF TR 120 · County 145, Ohio · Built 1990 · 2 Lanes · 245 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.8853, -83.103322
This bridge is in worse condition than 13.1% of bridges in County 145. The average bridge in Ohio is 0 years old; this one is 36 years old.
Nearby Bridges
PLEASANT HILL ROAD over PLEASANT HILL(MCCULLOUGH
Built 2003
HENLEY-DEEMER ROAD over HENLEY-DEEMER(MCCOLLOUGH
Built 2008
DUCK RUN ROAD over DUCK RUN RD (DUCK RUN)
Built 1993
POLLOCK ROAD over POLLOCK ROAD (SWEENY RUN
Built 1997
STATE ROUTE 348 over MCCULLOUGH CREEK
Built 1996
HENLEY-COMSTOCK RD over HENLEY-COMSTOCK(MCCULOUG
Built 1992
ARION ROAD over ARION ROAD (WRIGHTS RUN)
Built 2011
ARION ROAD over ARION RD(SCIOTO BRUSH CR
Built 2007
DIEHLMAN ROAD over DIEHLMAN RD (MCCULLOUGH)
Built 2013
SR 348 over STREAM
Built 2021
Bridge Details
- Structure #
- 7336993
- Year Built
- 1990
- Length
- 7.6 m (24.9 ft)
- Max Span
- 6.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 245
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,000
- Total Project Cost
- $20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.