SR 348 over SCIOTO RIVER OVERFLOW

0.62 MI E OF JCT SR 104 · County 145, Ohio · Built 1972 · 2 Lanes · 8,739 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
7305826
Year Built
1972
Length
161.2 m (528.9 ft)
Max Span
12.2 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
8,739
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.