USR 23 over OHIO RIVER CSX FRONT ST

OVER OH RIVER @ PORTSMOUT · County 145, Ohio · Built 2006 · 2 Lanes · 7,434 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
7300026
Year Built
2006
Length
656.8 m (2154.9 ft)
Max Span
266.7 m
Width
19.8 m (65 ft)
Lanes
2
Daily Traffic
7,434
Material
Steel
Design
Stayed Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.