CR 32 over WAGNER DITCH

.19 MILES NORTH OF CR 1 · County 143, Ohio · Built 2016 · 2 Lanes · 317 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
7244178
Year Built
2016
Length
10.7 m (35.1 ft)
Max Span
9.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
317
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$88,000,000
Total Project Cost
$98,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.