I80 OH TPK over DITCH

7.5MI EAST OF EXIT 6 · County 143, Ohio · Built 1954 · 6 Lanes · 42,820 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
7229585
Year Built
1954
Length
12.5 m (41 ft)
Max Span
5.5 m
Lanes
6
Daily Traffic
42,820
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.