FANGBONER RD over I80 OHIO TPK

0.6MI WEST OF EXIT 91 · County 143, Ohio · Built 1954 · 2 Lanes · 30,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
7229003
Year Built
1954
Reconstructed
1989
Length
61.9 m (203.1 ft)
Max Span
21 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
30,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.