FOUGHT RD over I80 OHIO TPK

5.1MI WEST OF EXIT 91 · County 143, Ohio · Built 1954 · 2 Lanes · 233 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
7228740
Year Built
1954
Reconstructed
1989
Length
63.1 m (207 ft)
Max Span
21.6 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
233
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.