CHARLESTON PIKE over DRY RUN

.04 MI. E OF CARMEL DR · County 141, Ohio · Built 1900 · 2 Lanes · 2,231 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
7146191
Year Built
1900
Reconstructed
1985
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
2,231
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$18,000
Total Project Cost
$23,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.