TONG HOLLOW RD over TRIBUTARY TO PAINT CREEK
2.51 MI. E OF SR-41 · County 141, Ohio · Built 2012 · 2 Lanes · 436 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.255389, -83.2562
This bridge is in worse condition than 2.8% of bridges in County 141. The average bridge in Ohio is 0 years old; this one is 14 years old.
Nearby Bridges
TONG HOLLOW RD over TRIBUTARY TO PAINT CREEK
Built 1950
STROUSE LN over UPPER TWIN CREEK
Built 1997
WHETSTONE RD over TRIB OF BUCKSKIN CREEK
Built 1978
FALLS RD over BUCKSKIN CREEK
Built 1985
SR 41 over PAINT CREEK
Built 1989
US 50 over PAINT CREEK
Built 1990
CALIFORNIA HOLLOW over TRIBUTARY OF PAINT CREEK
Built 1975
POTTS HILL RD over TAYLOR RUN
Built 1993
US 50 over MASSIE RUN
Built 1960
PAUGH RD over BUCKSKIN CREEK
Built 2003
Bridge Details
- Structure #
- 7132107
- Year Built
- 2012
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 436
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.