US 35 over SCIOTO RIVER

.87 MI W OF US 50 · County 141, Ohio · Built 1969 · 2 Lanes · 28,647 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
7102259
Year Built
1969
Length
392 m (1286.1 ft)
Max Span
42.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
28,647
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.