USR 35 over SR 159 (BRIDGE ST)

OVER SR 159 · County 141, Ohio · Built 1968 · 2 Lanes · 5,460 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
7102070
Year Built
1968
Length
52.7 m (172.9 ft)
Max Span
13.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
5,460
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.