LUCAS-PERRYSVILLE over Stream

0.1 MI East of SR-39. · County 139, Ohio · Built 2014 · 2 Lanes · 451 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
7035500
Year Built
2014
Length
18.6 m (61 ft)
Max Span
18.3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
451
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.