MARION AVE. RD. over CLEAR FORK MOHICAN RIVER

0.04 MI S OF MILLSBO. RD. · County 139, Ohio · Built 1947 · 2 Lanes · 1,199 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
7032285
Year Built
1947
Reconstructed
1984
Length
12.8 m (42 ft)
Max Span
12.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
1,199
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$197,000
Total Project Cost
$211,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.