Summit Road over Breakneck Creek

2.3 mi. W of JCT SR 44 · County 133, Ohio · Built 1973 · 2 Lanes · 6,054 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
6732704
Year Built
1973
Length
40.2 m (131.9 ft)
Max Span
14.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
6,054
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.