IR76 over OVER POR-SR 225-1074

JCT OF IR 76 AND SR 225 · County 133, Ohio · Built 1965 · 2 Lanes · 12,652 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
6702945
Year Built
1965
Reconstructed
2001
Length
36 m (118.1 ft)
Max Span
13.7 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
12,652
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.