CO RD 4 over TRIB TO PIKE LAKE

2.91 MI N. OF JCT CR3 · County 131, Ohio · Built 2002 · 2 Lanes · 280 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
6633803
Year Built
2002
Length
7.6 m (24.9 ft)
Max Span
7.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
280
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.