I80 OH TPK over SUGAR CREEK

9.6MI EAST OF EXIT 71 · County 123, Ohio · Built 1954 · 6 Lanes · 44,219 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
6229921
Year Built
1954
Reconstructed
1999
Length
40.8 m (133.9 ft)
Max Span
12.5 m
Width
38.3 m (125.7 ft)
Lanes
6
Daily Traffic
44,219
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.