SR 163 over PORTAGE RIVER

3.21 mi. East of SR 2 · County 123, Ohio · Built 1933 · 4 Lanes · 3,246 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
6201628
Year Built
1933
Reconstructed
2018
Length
104.9 m (344.2 ft)
Max Span
30.2 m
Width
15.9 m (52.2 ft)
Lanes
4
Daily Traffic
3,246
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.