SR 51 over PACKER CREEK

1.01 mi. North of SR 163 · County 123, Ohio · Built 1990 · 2 Lanes · 9,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
6201075
Year Built
1990
Length
19.8 m (65 ft)
Max Span
18.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
9,700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.