SR 19 over PORTAGE RIVER

0.27 MI. S. OF SR 163 · County 123, Ohio · Built 1993 · 2 Lanes · 6,484 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
6200885
Year Built
1993
Length
101.2 m (332 ft)
Max Span
21.6 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
6,484
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.