SR 145 over MIDDLE CREEK

0.03M N OF JCT SR 564 · County 121, Ohio · Built 1965 · 2 Lanes · 680 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
6101801
Year Built
1965
Length
28.2 m (92.5 ft)
Max Span
10.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
680
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.