IR 77 over BUFFALO RUN

0.77M N WASH. CO. LINE · County 121, Ohio · Built 1969 · 2 Lanes · 8,997 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
6100031
Year Built
1969
Length
32.3 m (106 ft)
Max Span
12.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
8,997
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.