EB SR 16 over EB SR 16 OVER CAPRAIL RR

.26 MI E OF LIC CO LINE · County 119, Ohio · Built 1997 · 2 Lanes · 4,025 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
6000045
Year Built
1997
Length
61.1 m (200.5 ft)
Max Span
22.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
4,025
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.