SR 95 over SHAW CREEK

3.36 MI E OF MARION CO · County 117, Ohio · Built 1970 · 2 Lanes · 4,523 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

40.57805, -82.897292

This bridge is in worse condition than 78% of bridges in County 117. The average bridge in Ohio is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
5901952
Year Built
1970
Length
30.2 m (99.1 ft)
Max Span
11.4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
4,523
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.