SR 309 over FLAT RUN

2.5 MI E OF MARION CO · County 117, Ohio · Built 1965 · 2 Lanes · 5,308 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
5900301
Year Built
1965
Length
26.2 m (86 ft)
Max Span
9.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
5,308
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.