SR 78 over MEIGS CREEK

1.8M W JCT SR83 · County 115, Ohio · Built 1983 · 2 Lanes · 673 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
5800889
Year Built
1983
Length
30.6 m (100.4 ft)
Max Span
11.4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
673
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.