IR-75 over IR 75 RAMP G

RAMP G I70 & I-75 INTCHG · County 113, Ohio · Built 2008 · 6 Lanes · 60,405 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
5709075
Year Built
2008
Length
22.5 m (73.8 ft)
Max Span
21.9 m
Width
38.1 m (125 ft)
Lanes
6
Daily Traffic
60,405
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.