IR-75 over GREAT MIAMI RIVER

1.77MI N. OF JCT. SR48 · County 113, Ohio · Built 2009 · 7 Lanes · 112,195 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
5708710
Year Built
2009
Length
176.1 m (577.8 ft)
Max Span
41.5 m
Width
41 m (134.5 ft)
Lanes
7
Daily Traffic
112,195
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.