NB/SB IR-75 over THIRD ST.; CR194A

.25MI. N. OF JCT. SR-4 · County 113, Ohio · Built 2014 · 8 Lanes · 123,721 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
5707838
Year Built
2014
Length
40.2 m (131.9 ft)
Max Span
40.2 m
Width
47.7 m (156.5 ft)
Lanes
8
Daily Traffic
123,721
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.