NB IR-75 over ALEX BELL ROAD

3.44MI.S OF JCT. SR-741 · County 113, Ohio · Built 1960 · 3 Lanes · 50,323 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
5706602
Year Built
1960
Length
39.9 m (130.9 ft)
Max Span
14.3 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
50,323
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.