C29 Sunfish Cr Rd over PINEY FORK

3.1 MI. E. OF JCT SR 26 · County 111, Ohio · Built 1958 · 2 Lanes · 833 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
5631009
Year Built
1958
Length
21.6 m (70.9 ft)
Max Span
20.7 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
833
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$45,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.