CR 14 LONG RUN over CLEAR FORK

0.33 MI EAST OF SR 260 · County 111, Ohio · Built 1900 · 2 Lanes · 477 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5630185
Year Built
1900
Length
21.3 m (69.9 ft)
Max Span
15.2 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
477
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$46,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.