SR 800 over SUNFISH CREEK

1.8M N OF JCT SR 78 · County 111, Ohio · Built 1954 · 2 Lanes · 2,390 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
5603307
Year Built
1954
Reconstructed
2000
Length
57.3 m (188 ft)
Max Span
12.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,390
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$599,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.