HETZLER over RUSH CREEK
0.77 N OF CR25A · County 109, Ohio · Built 1955 · 2 Lanes · 2,227 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.171122, -84.23985
This bridge is in worse condition than 87.2% of bridges in County 109. The average bridge in Ohio is 0 years old; this one is 71 years old.
Nearby Bridges
IR-75 over CR 25-A
Built 1959
CR25-A over RUSH CREEK
Built 2007
IR-75 over CR 25-A
Built 1959
TR257 NO. DIXIE DR over RUSH CREEK
Built 2004
IR-75 over RAMP B & B&O RR
Built 1959
IR-75 over RAMP B & B&O RR
Built 1959
SR-66 over SWIFT RUN
Built 1960
SR-66 over HYDRAULIC SPILLWAY
Built 1960
CR25A over MIAMI RIVER
Built 1950
PIQUA-LOCKINGTON over MIAMI RIVER
Built 1972
Bridge Details
- Structure #
- 5536219
- Year Built
- 1955
- Length
- 15.9 m (52.2 ft)
- Max Span
- 15.2 m
- Width
- 5.8 m (19 ft)
- Lanes
- 2
- Daily Traffic
- 2,227
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $134,000
- Total Project Cost
- $154,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.