CR193 TROY-URBANA over LOST CREEK

0.05 E OF TR21 · County 109, Ohio · Built 1951 · 2 Lanes · 1,870 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
5535980
Year Built
1951
Reconstructed
2005
Length
44.2 m (145 ft)
Max Span
16.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,870
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$378,000
Total Project Cost
$398,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.